Sky High Homes LLC

Sky High Homes LLC Having experience in many trades we are happy to assist with any projects you may need accomplished.

My son's current song and he doesn't even know it haha.
03/24/2026

My son's current song and he doesn't even know it haha.

Bug Hunter ยท Bigger Than Myself ยท Song ยท 2020

Now on to the flooring. Looks fabulous and customer is happy.
01/10/2026

Now on to the flooring. Looks fabulous and customer is happy.

Flooding impacted the whole house with damage to drywall, trim, flooring and crawlspace. Project with
12/06/2025

Flooding impacted the whole house with damage to drywall, trim, flooring and crawlspace. Project with

Had a tough job in Vesper but the work was definitely worth it. Bathroom makeover and floor repair. I think the color wa...
12/04/2025

Had a tough job in Vesper but the work was definitely worth it. Bathroom makeover and floor repair. I think the color was the hardest decision.

Insulation installed, drywall hung and finished, 1 coat of primer, trim stained to match and installed. ๐Ÿ˜
10/21/2025

Insulation installed, drywall hung and finished, 1 coat of primer, trim stained to match and installed. ๐Ÿ˜

Another attic done with Janesville Insulation! The bathroom vent had no venting so we made sure to run it correctly out ...
10/13/2025

Another attic done with Janesville Insulation! The bathroom vent had no venting so we made sure to run it correctly out of the house!

Insulation, plastic and foam complete. Thank you Janesville Insulation for the work! ๐Ÿ˜
09/21/2025

Insulation, plastic and foam complete. Thank you Janesville Insulation for the work! ๐Ÿ˜

Concrete pad and sidewalk have been removed. Along with a light fixture swap for another customer.
08/28/2025

Concrete pad and sidewalk have been removed. Along with a light fixture swap for another customer.

The roof was sagging so we added temporary supports, built a new deck, raised the roof, added necessary support and made...
08/27/2025

The roof was sagging so we added temporary supports, built a new deck, raised the roof, added necessary support and made some stairs.๐Ÿ˜

Framing complete. Now to wait for inspection before finishing the porch.
06/06/2025

Framing complete. Now to wait for inspection before finishing the porch.

Our project for the week. Removed the old deck boards and joists. 5- 4 foot holes dug and concrete poured. Over 6,600 po...
06/05/2025

Our project for the week. Removed the old deck boards and joists. 5- 4 foot holes dug and concrete poured. Over 6,600 pounds of concrete.

Address

Janesville, WI
53546

Alerts

Be the first to know and let us send you an email when Sky High Homes LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Sky High Homes LLC:

Share