10/23/2016
PICOR will always strive to maintain the highest standard of engineering excellence, never forgetting the cornerstone of engineering is ingenuity.
PICOR will always strive to maintain the highest standard of construction management excellence, never forgetting the cornerstones of construction management are planning, communication, verification and accountability.
PICOR will always strive to maintain the highest standard of loyalty and degree of commitment to the people conducting its affairs, never forgetting that loyalty and commitment are the cornerstones of success.
The following are some of the key train loading system projects that PICOR and/or Tony Walker has implemented original design concepts without ready-made solutions within the US, AU and NZ.
Bow Valley Coal (Kentucky) Inc.
Batch Weighing Unit Train Loadout with Sampling System, 3,500 TPH certified May 1981
NER of Kentucky, Batch Weighing Unit Train Loadout with Sampling System, 3,500 TPH, certified September 1981
Interstate Coal Company
Batch Weighing Unit Train Loadout with Sampling System, 5,000 TPH, certified July 1982
Bell County Coal Company
Batch Weighing Unit Train Loadout with Sampling System, 4.000 TPH, certified January 1984
OBED Mountain Coal Company, Ltd.
Batch Weighing Unit Train Loadout System, 3,600 TPH, certified July 1984
Carter Mining Company, Rawhide Mine
Batch Weighing Car Topping System, 10,000 TPH, certified January 1985
Tower Resources, Inc.
Batch Weighing Unit Train Loading System with Sampling System, 5.500 TPH, certified May 1985
Rogers Energy
Batch Weighing Unit Train Loading System, 3,500 TPH, certified May 1985
Ridgeway Coal Company
Batch Weighing Rail Car Loadout System with Automatic Sampling System, 2,000 TPH, certified July 1985
Interstate Coal Company
Batch Weighing Unit Train Loading System with Automatic Sampling System, 5,500 TPH, certified July 1987
Westmoreland Coal Company
Unit Train Loading System designed for future batch weighing and sampling, 3,500 TPH
Thunder Basin Coal Company
Batch Weighing Unit Train Loading System, 10,000 TPH certified December 1988
Thunder Basin Coal Company
Batch Weighing Unit Train Loading System, 6,000 TPH certified December 1989
Heartland Resources
Batch Weighing Unit Train Loading System, 4,000 TPH certified August 1991
Premier Elkhorn
Batch Weighing Unit Train Loading System, 6,000 TPH certified August 1994
Kenncott Energy - Cordero Mining
4(four) Train Precision Loading Systems, 10,000 TPH certified August 1996 and January 1997
Kennecott Energy - Cordero-Rojo Complex
2 (two) Train Precision Loading Systems, 10,000 TPH certified 2001
Century Mine
Patented Triple Batch Train Precision Loading System, 4,000 TPH certified 2002
BHP - Billiton Mitsubishi Alliance
Train Reclaim Loading System, 4,000 TPH, Operational June 2003
Port of Tauranga
New Zealand
Train Loading System, 3,000 TPH, Operational December 2004
Wambo Mine
Unit Train Loadout with Sampling System, 4500 tonnes, Operational March 2006
Millennium Mine
Unit Train Loadout with Sampling System, 4,500 tonnes, Operational July 2006
PICOR
1730 Old Gray Station Road
Johnson City, Tennessee 37615 USA
423.282.9900
It is the mission of PICOR to provide to its clients the best, most innovative, cost-effective facilities possible.