10/26/2026
Before the power comes on, we put the work in. ⚡💪
Wrapped this one up today—electrical trench, electrical vault, and precast transformer lid prep. Backfilled, graded, added a little extra gravel in the laydown area,, and equipment loaded for the next one.
Most of our work ends up underground. Still something to be proud of. Give us a call for all your excavation needs today for a free quote!