Rigdon Construction and Excavating LLC

Rigdon Construction and Excavating LLC We offer all your home remodeling needs. We offer new construction pole barns and additions. Also offering excavating and grading.

Got this one poured earlier this week! Got a few loads a dirt brought in to grade out the ground around the pad. A littl...
06/05/2026

Got this one poured earlier this week! Got a few loads a dirt brought in to grade out the ground around the pad. A little more dirt to be brought in and we’ll get the carport back on the slab next week!

We’ve made some progress on this exterior. We installed fan fold insulation on the front and side wall. Repaired a coupl...
06/05/2026

We’ve made some progress on this exterior. We installed fan fold insulation on the front and side wall. Repaired a couple spots on the walls and resheeted the whole bottom half of the front wall to match the top. We got house wrap started and working our way around to the other side. The guys are prepping for stone on the bottom of the walls and porch posts. We removed the old front door and reframed it for a bigger door. Got the new door installed, just need to finish the door jambs and it’s ready for metal wrap! That’s a wrap on this one until next week!

Got this carport moved and set up for a new concrete pad! All graded in and pins set ready to pour tomorrow.
06/01/2026

Got this carport moved and set up for a new concrete pad! All graded in and pins set ready to pour tomorrow.

We wrapped up phase one of this house remodel! All the concrete driveway is poured and will be ready to drive on next we...
05/29/2026

We wrapped up phase one of this house remodel! All the concrete driveway is poured and will be ready to drive on next week. Next week we start phase two the siding, soffit, and windows.

We got another section down on this one and back to waiting on concrete. We got all the drains and downspouts tied in wi...
05/20/2026

We got another section down on this one and back to waiting on concrete. We got all the drains and downspouts tied in with new tile. Everything’s graded and pins set for another pour.

We got the last section of footer poured on this one yesterday. The guys have the house and porches all finished and rea...
05/20/2026

We got the last section of footer poured on this one yesterday. The guys have the house and porches all finished and ready to start the garage.

This last week we’ve been busy with concrete! We removed an old shed off the property and started prepping for the new d...
05/09/2026

This last week we’ve been busy with concrete! We removed an old shed off the property and started prepping for the new driveway. We installed a new drain tile from the front porch to the existing tile on the side of the house. We also installed a new drain across the whole front of the house to catch any water. We also removed the existing porch and set new post for the roof. Got the first section of concrete down and the second ready to pour next week. Check this one out once we’re complete!

The last week the guys have been hard at it! They’ve been battling with the rain and mud. We dug the crawl space out and...
04/29/2026

The last week the guys have been hard at it! They’ve been battling with the rain and mud. We dug the crawl space out and started laying block. The guys laid the whole house and support piers. Next to lay the porches and start on the garage on this one! Another great job from the guys.

Knocked out this little bathroom remodel! Removed the old shower unit and started prepping for a new one. We installed a...
04/24/2026

Knocked out this little bathroom remodel! Removed the old shower unit and started prepping for a new one. We installed a new shower faucet and new plumbing from the floor up. Installed a new exhaust fan and repainted the bathroom. We also installed all new plumbing under the kitchen sink and a new kitchen sink. This one’s a wrap!

We dug this footer out earlier this week and got it poured today! In a couple days we’ll come back and dig the crawl spa...
04/17/2026

We dug this footer out earlier this week and got it poured today! In a couple days we’ll come back and dig the crawl space out. After that we’ll bring in the block and get the foundation layed up. We’ll also dig the last footer for the garage section. Get ahold of us for any footers or foundations needed!

Address

347 Vine Street
Kenton, OH
43326

Telephone

+15676740691

Website

Alerts

Be the first to know and let us send you an email when Rigdon Construction and Excavating LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Rigdon Construction and Excavating LLC:

Share