Estis by Flowco

Directions Website Contact the business

Estis by Flowco Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Estis by Flowco, Energy Company, 2019 STATE Highway 135 N, Kilgore, TX.

Estis by Flowco is one of the industry's leading experts on wellpad compression and a pioneer in (HPGL) high pressure gas lift—helping upstream oil & gas operators maximize uptime, production and profits.

How does High-Pressure Gas Lift work?HPGL works by increasing the gas-liquid ratio within the wellbore to reduce the wei...
09/08/2026

How does High-Pressure Gas Lift work?

HPGL works by increasing the gas-liquid ratio within the wellbore to reduce the weight of the fluid column.

Compressed natural gas is injected down the production tubing to the end of tubing, where it mixes with the oil, water and formation gas already in the well.

As the gas-liquid ratio increases, the fluid column becomes lighter. This reduces bottomhole pressure and allows the reservoir to move fluids toward the surface more efficiently.
Produced fluids then return to the surface through the annulus.

By injecting gas at the end of tubing, HPGL provides lift from deeper in the wellbore and can support accelerated drawdown during the early stages of production.

Learn more about how High-Pressure Gas Lift works:
👉 https://bit.ly/46hlIHo

Today, we recognize National Petroleum Day and the people who continue to move our industry forward.Since the first succ...
08/27/2026

Today, we recognize National Petroleum Day and the people who continue to move our industry forward.

Since the first successful commercial oil well was drilled in Titusville, Pennsylvania, on August 27, 1859, oil and gas production has continued to evolve through new technology, new challenges and generations of problem-solvers.

At Estis by Flowco, we’re proud to be part of that evolution, developing solutions that help operators produce more efficiently and meet the demands of today’s wells.

Here’s to the people, innovation and hard work behind the energy industry.

Confidence in the field starts with preparation.Last week, our technicians completed Murphy Engine Integrated Control Sy...
08/07/2026

Confidence in the field starts with preparation.

Last week, our technicians completed Murphy Engine Integrated Control System (EICS) training. Through hands-on instruction, the team strengthened its knowledge of engine controls, system configuration, diagnostics, and troubleshooting.

Continued training prepares our technicians to respond when customers need them most, whether during routine service or an unexpected equipment issue. As production environments and control systems continue to evolve, Estis by Flowco remains committed to investing in the people responsible for keeping equipment operating safely, efficiently, and reliably.

Last week, Warren CAT’s Gas Engine Systems class came to our Midland-Odessa facility for three days of hands-on training...
07/16/2026

Last week, Warren CAT’s Gas Engine Systems class came to our Midland-Odessa facility for three days of hands-on training with our Flowco compression teams.

They covered parts ID, systems and controls, electrical theory, and lab work. But some of the best learning happened outside the classroom.

Around the shop and over lunch, experienced techs shared real field lessons with the newer team members. The kind of lessons you only get from years of doing the work.

That mix of structured training and field experience is what keeps good teams sharp.

07/14/2026

HPGL brings together two concepts the industry has understood for decades: annular gas lift and single-point gas lift.

Annular gas lift uses the casing-tubing annulus as the flow path, which creates more surface area and helps reduce frictional pressure. In high-rate wells, that friction can be one of the biggest limits on production.

Single-point gas lift keeps the downhole setup simple. Open-ended tubing is set at depth, gas enters at the tubing tail, and the system lifts from the bottom without packers, mandrels, unloading valves, or moving parts below surface.

HPGL combines those ideas and adds the pressure needed to make the system work from the lowest point in the well on day one. Depending on TVD and fluid weight, that can mean 2,500 to 5,500 psi at surface.

This results in a high-pressure flow path built to help overcome tubing pressure, reduce flowing bottomhole pressure, and support high IP rates.

That's HPGL - Two proven methods combined into one solution. Since the launch of HPGL, Estis has delivered 5000+ proven HPGL installations across North American unconventionals.

What are gas lift compression packages?Gas lift compression packages provide the surface equipment needed to inject gas ...
07/07/2026

What are gas lift compression packages?

Gas lift compression packages provide the surface equipment needed to inject gas into the wellbore, helping reduce fluid density and support increased production from existing wells.

Estis by Flowco offers modular compression systems built for reliable field performance, flexible deployment, and changing well conditions. Operators can match the right package to their production goals, project timeline, and field needs.

Our compression packages are designed to help keep lift efficient, operations moving, and production on track.

Learn more about Flowco’s gas lift compression packages.

https://bit.ly/4vyPVws

06/02/2026

When we first started talking about ZTECH4 | SENTRY, one of the questions we heard was pretty straightforward:

“Are you actually reducing methane, or are you just moving the problem?” . . .Fair question.

So instead of just saying it worked, we had two independent third parties come out and test it in the field.

What they found was zero leaks on the compressor.

And on the emissions side, the methane is not being vented raw to atmosphere. It is burned in the engine, where it goes through a chemical change.

ZTECH4 | SENTRY is already running in the field, helping operators take a cleaner approach without adding a complicated or overpriced solution to the location.

If you want to see what that could look like on your site, talk to one of our specialists.

https://bit.ly/4fSOe83

If you’re still running the same lift strategy from five years ago, you’re not running your wells well.At SWPSC 2025, Fl...
04/17/2025

If you’re still running the same lift strategy from five years ago, you’re not running your wells well.

At SWPSC 2025, Flowco’s experts will challenge the status quo and show you the future of production optimization—from high-pressure gas lift to automation.

Be there. April 21-24. Booths 117 & 86.

Because when it comes to production, well begun is half done.

Address

2019 STATE Highway 135 N
Kilgore, TX
75663

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when Estis by Flowco posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Estis by Flowco:

Shortcuts

Share

Category