07/20/2026
This is what eight hours of crawl space work looks like compressed into 30 seconds.
Three guys, two passes of cleanup, one v***r barrier roll-out, a rim joist re-seal, and the rebuild that the homeowner doesn't see but feels six months later in the floor temperature and the energy bill.
The before is what they found. The after is what they left.
***rbarrier