08/14/2026
🚧 What happens underneath the floor before a building is finished?
Here’s a behind-the-scenes look at some of the plumbing work taking shape at one of our project sites!
Before the concrete is patched and the finished flooring goes down, the underground plumbing has to be carefully laid out and coordinated. These lines and rough-ins will eventually serve the plumbing fixtures throughout the space — but once construction is complete, most of this work will never be seen again.
That’s why getting it right at this stage matters.
Plumbing design isn’t just about where a sink or fixture goes. The system has to account for pipe routing, drainage, proper slope, connections, fixture locations, structural conditions, and coordination with the rest of the building.
It may look like a construction zone now, but there’s a lot of planning underneath all that dirt. 👷♂️📐
We love getting to see our designs make the jump from plans to real life!