10/05/2026
We have been slacking on updating. We have been busy. A nice 120’x100’ house pad and a 800’x20’ driveway in Steele, MS. First 2 pictures are what we started with, we cut down in pad area about 4’-5’. Using material on site to build back up in 1’ compaction tested lifts. We roughly moved 2,250 yards of dirt for pad. The excavated dirt was used to build up and taper from front edge of pad for a front yard. Once house is complete and the pool area is laid out, we will remove more material if needed or slope current bank on a 3:1 slope so it can be maintained with lawnmower. We moved roughly 1,900 yards of dirt for driveway. We hauled in 2”-4” rock for driveway (not pictured). 1.5” rock will be hauled in to cap driveway once construction is complete.
We offer clearing, drainage/ditching, grade work, pads, stumping, pond building/repairs, hauling of dirt and aggregate, demo, bush hogging, brush cutting, etc on the dirt work side.
We also have a metal fabrication side.
Welding/repairs, custom utility or equipment trailers.
We build angle iron and tubing trusses. Up to 40’ on angle iron gable trusses. Up to 30’ angle iron lean to trusses. Up to 50’ on tubing gable trusses. Up to 40’ tubing lean to trusses. We just started offering I beam trusses if you are wanting to go wider than 50’ or be able to lift heavier loads from overhead winch. We offer header trusses and freestanding cantilever/awning trusses up to 12’. We also build pipe fence, catch pens, gates, etc and regular field fence(barb&net wire).
Contact us @601 #507 #1319 for any interest in a quote. We take pride and stand behind any of our work.