11/10/2024
Temporary Pause 11/10/24 Repair
Scheduled Work
Effective immediately pellet scheduled work requests will pushed out around the timeframe of mid December
Some of the reasons are as follows:
Scheduler:
She is down with a cold/flu that is over the top. She already has a 40 plus hour job and needs to just stop and get rested.
Native Maine’ah:
Raging T-2 diabetes, 2.5 weeks with this “cold flu”, walking pneumonia, spinal, nerve issue lower back currently very limited mobility – no driving / limited walking/
We still have a Saturday tech and he will doing as much as he can.
Not to worry – we will be back as full speed as possible