05/29/2026
Most facility expansions do not fail in design. They fail in the tie-ins. https://www.webbersmith.com/
At IDDBA 2026 you will see great equipment and product ideas.
The hidden risk shows up later when utilities and sanitation routing get decided under time pressure. https://www.iddba.org/iddba-show
A practical way to reduce risk early:
- Confirm utilities capacity and routing (power, hot water/steam, refrigeration, drainage)
- Validate people and product flow, especially around RTE and allergens
- Plan phasing based on how you actually run production, not a perfect-world schedule.
If you will be in Orlando June 7-9, book 15 minutes with Jeremy at WEBBER/SMITH:
https://meetings-na2.hubspot.com/jeremy-belk