Jack Tyler Engineering, Inc.

Jack Tyler Engineering, Inc. Jack Tyler Engineering provides you with state-of-the-art pumping systems, compressed air systems, and process equipment from leading manufacturers.

With a team of engineers and factory-trained service technicians on call 24/7, we are here to serve you!

We want to take a moment to say thank you to all of our partners who supported us at the 2026 AR Water Conference.Whethe...
05/04/2026

We want to take a moment to say thank you to all of our partners who supported us at the 2026 AR Water Conference.

Whether you joined us in person or supported us by providing materials, your partnership is what makes events like this successful. We’re proud to represent companies that are committed to solving real challenges in the water and wastewater industry.

A big thank you to:

Alfa Laval – Coplastix, Biorem Technologies, DeZurik, FKC, FRC, Goulds, Hightide (HTT), Invent Environmental, Ixom Water Care, Loprest, Lutz-Jesco, Pentair Myers, Pulsar Measurement, Rotork, Red Valve, Rudolf Messner Umwelttechnik AG, Simflo, Texas Aquastore, Tracom, Wastewater Depot, Xylem Flygt, Xylem YSI, Aquarius Technologies, AWI, Duperon Corporation, Enaqua, Gardner Denver (Hoffman & Lamson), Peabody Tanks, USEMCO, Vogelsang, Centrisys, Municipal Filter Group (MFC), Orenco, and Hidrostal.

We appreciate the time, effort, and collaboration from each of you—and we’re looking forward to continuing to build on that momentum.

04/28/2026
Last week we started up a new Orenco Systems, Inc. WWTP. This plant is designed to treat 50,000 gals average daily flow ...
04/19/2026

Last week we started up a new Orenco Systems, Inc. WWTP. This plant is designed to treat 50,000 gals average daily flow into a drip field onsite. Effluent only sewer reduces operation and maintenance man hours along with reducing odor which is ideal for residential locations like this one. It was great working with ECCI on the design and Terracon for the construction of this project.

Still relying on outdated controls? Let’s upgrade it → sales@jteng.comWhen your controls fall behind, everything else fe...
04/09/2026

Still relying on outdated controls? Let’s upgrade it → [email protected]

When your controls fall behind, everything else feels it.

Inconsistent performance.
Limited visibility.
More reactive decisions.

JTE designs and upgrades control systems that give you:
✔ Better data
✔ Better control
✔ Better reliability

Because your system should work with you — not against you.

Air system costing you more than it should? Let’s take a look → jteng.comCompressed air is one of the most overlooked — ...
04/07/2026

Air system costing you more than it should? Let’s take a look → jteng.com

Compressed air is one of the most overlooked — and most expensive — utilities in your plant.

Leaks. Inefficiency. Aging equipment.
It all adds up fast.

We help customers:
✔ Reduce energy waste
✔ Improve reliability
✔ Get more out of their systems

Because better air = better production.

Pump issues slowing you down? Let’s fix it → sales@jteng.comWhen a pump goes down, it’s never just the pump.It’s the sys...
04/06/2026

Pump issues slowing you down? Let’s fix it → [email protected]

When a pump goes down, it’s never just the pump.
It’s the system behind it… and everything depending on it.

At JTE, we don’t just swap equipment —
we make sure the right pump is in the right application, built to run the way your operation demands.

Less guessing.
Less downtime.
More confidence.

When a local apartment complex in Northwest Arkansas lost both pumps and had a failing control panel, they needed a fast...
03/20/2026

When a local apartment complex in Northwest Arkansas lost both pumps and had a failing control panel, they needed a fast, reliable solution — not a temporary fix.

If your system is showing signs of failure, don’t wait until it goes down.

📧 [email protected]

The JTE team stepped in and delivered a full upgrade:

- Installed new pumps
- Replaced the control panel with a new pedestal mount
- Added new floats
- Replumbed the discharge assembly to raise the header for easier, safer servicing

Now they’ve got a system that’s not only back up and running — but built to be maintained properly moving forward.

This is what we focus on at JTE: solving the problem today while setting you up for fewer headaches tomorrow.

When a system is down, the right team makes all the difference. Learn how at jteng.comA truck fleet facility recently ca...
03/11/2026

When a system is down, the right team makes all the difference. Learn how at jteng.com

A truck fleet facility recently called JTE after their station was completely offline — no power, no working pumps, a failed control panel, and discharge piping in rough condition.

Our team stepped in to deliver a full retrofit, installing a new pump, control panel, and discharge assembly to get the system back up and running safely and reliably.

Great work by David Munson, Drew Macintire, Brandon Wilson and the JTE service team turning a major problem into a dependable solution.

When a mobile home park needed to replace a broken grinder station, Drew Macintire and Brandon Wilson provided a dependa...
02/19/2026

When a mobile home park needed to replace a broken grinder station, Drew Macintire and Brandon Wilson provided a dependable solution — a Myers Duplex Grinder Station Package built for reliable wastewater performance.

Replacing a failing station isn’t just about swapping equipment — it’s about restoring confidence, preventing backups, and protecting the property long term.

Great work by Drew and Brandon delivering a solution that keeps things flowing the way they should.

https://jteng.com/

01/27/2026

All offices will be open from 10A - 4P on Wednesday, January 28th.

Thank you!

01/27/2026

Our Little Rock office will reopen on Tuesday, January 27, 2026.

Our Springdale office will remain closed.

Our Ashdown office will also be closed, however, we do have personnel on standby at this location in the event of an emergency.

Thank you, and continue to remain safe and warm!

Address

6301 S. University Avenue
Little Rock, AR
72209

Opening Hours

Monday 8am - 5am
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+1501-800-562-2296

Alerts

Be the first to know and let us send you an email when Jack Tyler Engineering, Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Jack Tyler Engineering, Inc.:

Share