03/19/2024
Encountered a few issues on this job marked “complete” by other guy. I was able to remount the lowers (level this time and center sink cabinet to window), repair the Sheetrock damaged from removal of old cabinets, and hang one last upper cabinet. Installed shelf and microwave. Then, was able to cut out, sand, stain and clear butcher block. Beautiful stain picked out by my customers and I was very happy with the way this project ended up. Let me help you with your next project!