10/15/2026
Nobody talks about the first week after installation.
The brochure shows the machine running perfectly. The sales conversation focuses on output numbers and payback periods. Both matter. But the first week is where trust is actually built, or lost.
We've installed case erectors across manufacturing and logistics facilities worldwide, and the first week tends to follow a pattern.
Day one is never about speed. It's about alignment: integrating the machine into the line, confirming blank feed settings, running at reduced speed to catch anything commissioning didn't show. Operators are watching closely. So are we.
Days two and three bring the questions. Not problems, questions. How does the changeover work in practice? What does this indicator mean? Good questions, the kind that only get asked once someone's actually run the machine.
By the end of the week, something shifts. The skeptical operators start running changeovers themselves. The line manager stops watching the case erector and goes back to watching the rest of the line.
The line we hear most often, a few months later, isn't about speed or footprint.
It's: "We should have done this sooner."
What's held your operation back from making a change you already knew you needed to make?