American Marine Construction

American Marine Construction Piers/Docks | Seawall/Bulkhead | Boathouses | Erosion Control | New Construction | Repair | Removal

This was a fun, super muddy one but the boys killed it once again! Clean lines everywhere you look πŸͺ’πŸ₯‡
10/08/2023

This was a fun, super muddy one but the boys killed it once again!
Clean lines everywhere you look πŸͺ’πŸ₯‡

Don’t get tunnel vision looking down these poles! We deliver quality and go beyond to ensure every customer is completel...
10/01/2023

Don’t get tunnel vision looking down these poles! We deliver quality and go beyond to ensure every customer is completely satisfied when their project is complete.

Customer had a small finger pier, to get to the backside of his boat, that was damaged in a storm. It was barely above t...
09/30/2023

Customer had a small finger pier, to get to the backside of his boat, that was damaged in a storm. It was barely above the water for easy kayak launch when originally built, but with higher tides, we rebuilt it using our rough cut framing lumber since it will spend some time under water. This will last longer than the dressed cut decking and the spacing will allow water to flow through and not pop the decking.

Call us for any and all pier, bulkhead, boathouse and erosion control repairs. Small 20’ repair
09/30/2023

Call us for any and all pier, bulkhead, boathouse and erosion control repairs. Small 20’ repair

Workday views for the boys
09/30/2023

Workday views for the boys

A quick 4’x50’ replacement in kind. With this kind of permit you can only do so much and keep the same footprint. Here w...
09/30/2023

A quick 4’x50’ replacement in kind. With this kind of permit you can only do so much and keep the same footprint. Here we did as much as we could to straighten the stairs and pier out while still complying with the permit.

Quick Replacement in kind. Old pier had decking running all different directions.  We ripped it out including pilings an...
09/30/2023

Quick Replacement in kind. Old pier had decking running all different directions. We ripped it out including pilings and rebuilt it hiding some pilings under deck and cleaned the decking layout up installing full span pieces, all lid the same direction. 6’ wide walkout transitions to a full 18’ wide platform that ran 20’ out. β€œSo much room for activities”

Another before and after. It was a challenge working around a boatlift and boathouse that were to remain. The boys got i...
09/29/2023

Another before and after. It was a challenge working around a boatlift and boathouse that were to remain. The boys got it done though! Pier turns smooth as butter.

A little before, during, and after on this nice 86’ long pier with a huge 10’x30’ platform β€œL”. Had a smooth taper from ...
09/24/2023

A little before, during, and after on this nice 86’ long pier with a huge 10’x30’ platform β€œL”. Had a smooth taper from 13’ down to 6’ as you access the pier. Came out really nice and will last the customers 30+ years

Address

12878 McCready Road
Lusby, MD
20657

Opening Hours

Monday 7am - 7pm
Tuesday 7am - 7pm
Wednesday 7am - 7pm
Thursday 7am - 7pm
Friday 7am - 7pm
Saturday 9am - 1pm

Telephone

+14439750754

Website

Alerts

Be the first to know and let us send you an email when American Marine Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to American Marine Construction:

Share