09/26/2026
Getting started on a fresh 68rfe build! Anyone wanna claim it before it gets built to a 550 unit for inventory? Can be built specifically for you at this time. All our units get Meticulously cleaned and inspected, New bearings/ bushings, OEM seal kits, new bonded pistons, tig welded output planetary, billet 4C snap ring retainer, Billet input shaft, extensive pump and valve body work/modifications, updated/oversized valves, vacuum tested along with several other billet upgrades including billet accumulator pistons and a billet channel plate.