10/09/2026
Lancaster General Hospital - Main Pharmacy Renovations
James CRAFT & Son was hired to demo the existing main Pharmacy in 5 different phases and install new duct, piping, plumbing and equipment while keeping the pharmacy in operation. We installed temporary duct to the Pharmacy from existing air handlers in the 3rd floor mechanical room and demoed 2 existing air handlers, then installed 2 new air handlers in 6 separate sections to be able to fit them in the tight spaces. A new Chiller and Glycol Skid enclosure was installed on the roof with 3 new exhaust fans. This project took a lot of coordination between the Hospital, Benchmark Construction, and CRAFT so the Pharmacy could remain open during construction.