11/04/2026
Subfloor is coming along. We are keeping things as flat as possible with minimal prep for the new LVP flooring. The two additions in this home have height variations that require additional time and planning, but we’re almost there. Next, frame the closets and laundry/pantry, and we will be preparing brick for insulation.