09/03/2026
Behind the meter: on-site power is rewriting the rules - and it all runs on fuel.
Data centers, hospitals, campuses, and manufacturers are designing on-site generation as primary power - driven by interconnection queues that stretch years and uptime the grid can't promise. For AI data centers, the constraint isn't land or chips. It's electrons.
But the megawatts are only half the story. An on-site plant consumes enormous fuel, and needs it as reliably as the power itself. That's where LPG, LNG, CNG, and SNG come in - as bridge fuel, backup, and peak-shaving supply. The resiliency of behind-the-meter power depends on the resiliency of its fuel supply.
Through TransTech Energy, our teams build the fuel layer on-site generation depends on - bulk storage, transfer, vaporization, pressure regulation, SNG, and backup-fuel infrastructure, engineered and fabricated under one.
One more example of how TransTech Group companies deliver the infrastructure critical operations depend on.
Read the full article: https://hubs.ly/Q04wh60-0
Explore how behind-the-meter power generation is transforming energy strategies, emphasizing the crucial role of fuel supply for reliability and resiliency.