All Home Meters

All Home Meters P.E. Molded case circuit breaker

Building Code Home Inspection

Professional Engineers,

Certificate of Use / Occupancy Inspection.

Professional Engineers, Level III & II Certified Infrared Thermographers, 40 Year Recertification Miami Dade, Building Structural, Electrical Thermography Inspection, NFPA 70B Maintenance Program- EMP City of Hialeah, Beach, Homestead, Broward County NFPA 70B Building Infrared Electrical Thermography Inspection Miami Dade 40 Year Recertification Inspection Hialeah Homestead Doral Coral Gables Boca

Raton Boyton Beach

Thermal Imaging Camera Scan Testing Services

NFPA Electrical Safety Maintenance Program Inspection

Ground Resistance Test Equipotential Bonding. Photometric Plan / Survey.

Infrared Thermography Inspection Miami by Level III Certified Thermographer Professional Engineer. Camera FLIR E96
07/29/2026

Infrared Thermography Inspection Miami by Level III Certified Thermographer Professional Engineer. Camera FLIR E96

07/05/2026

Infrared Thermography Inspection Miami Dade County Electrical Thermal Imaging

07/05/2026

40 Year Recertification Miami Dade County, Miami Beach, Hialeah, Homestead, Doral, Coral Gables, Broward County: Electrical, Structural, Parking Illumination, Guardrail Certification & Infrared Thermography Inspection

03/30/2026

The 400A Threshold Does Not Mean Only the 400A Main Disconnect Gets Inspected

One of the most common misconceptions among building owners and property managers in Miami-Dade County is that the infrared thermography requirement for the 40-year electrical recertification only applies to a 400-ampere main panel — and only to equipment rated at 400 amperes. BORA addressed this directly.

On July 21, 2022, the Board of Rules and Appeals affirmed the clarification issued by the BORA Building Subcommittee. The advisory memo issued the following day by Jaime D. Gascon, P.E., Board and Code Administration Division, states clearly:

"The threshold for requiring thermographic inspection shall be an electrical service rating of 400 amperes or higher."

"The equipment called out in the guidelines for thermographic inspection must be supplied by an electrical service of 400 amperes or higher, but the individual equipment to be inspected DOES NOT need to be rated at 400 amperes or higher."

This means: if your building is served by 400A or more, the thermographic inspection is required — and every piece of electrical equipment fed by that service is subject to inspection, regardless of its individual amperage rating. Sub-panels, breakers, disconnects, and distribution equipment all fall within scope.

The same memo also clarified two additional points relevant to thermographer qualifications:

"A Level 2 thermographer's required experience DOES NOT need to be exclusively obtained through the performance of thermographic inspections but can be obtained through inspections of electrical systems associated with commercial buildings in general."

"The minimum number of years of experience required was reduced to 5 years from 7 years."

If your building has a 400A or greater electrical service and your 40-year recertification thermographic inspection did not cover all equipment fed by that service — your report may be incomplete.

Source: BORA Advisory Memo, July 22, 2022.https://www.miami.gov/files/sharedassets/public/v/1/building/220722-thermographic-inspections-and-clarifications.pdf

allhomemeters.com

Address

16520 SW 66 Street
Miami, FL
33193

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Telephone

+17863187203

Alerts

Be the first to know and let us send you an email when All Home Meters posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share