It wouldn't be a normal day on the job without a little drama...THREE times they finish work, caution tape and cone it o...
10/20/2023

It wouldn't be a normal day on the job without a little drama...

THREE times they finish work, caution tape and cone it off and someone steps into it.

It's like having a bunch of toddlers running around the job site you can't walk away for 2 seconds without someone getting into something. Have to babysit the finished work and watch it get hard.

No time to take a picture of the other two bad mishaps...but someone's walking around with concrete feet up past their ankles and tried to take off and hide in the mall.

Endless little tear outs and replacing of sidewalk, curb, ect. around Hobby Lobby.
10/19/2023

Endless little tear outs and replacing of sidewalk, curb, ect. around Hobby Lobby.

Early mornings before the sun comes up all last week to help prepare the parking lot for the Grand Opening of Hobby Lobb...
10/18/2023

Early mornings before the sun comes up all last week to help prepare the parking lot for the Grand Opening of Hobby Lobby in Midland.

Trailer tear down
10/11/2023

Trailer tear down

14x12 shed pad with a 16" rat wallSidewalk with a 20x24 padReplaced City sidewalk and approachcut curb and ground down t...
10/10/2023

14x12 shed pad with a 16" rat wall
Sidewalk with a 20x24 pad
Replaced City sidewalk and approach
cut curb and ground down to widen approach

Getting this job set up and ready for concrete
10/09/2023

Getting this job set up and ready for concrete

Top soil
09/29/2023

Top soil

2nd part graded, formed and poured ✅
09/28/2023

2nd part graded, formed and poured ✅

First part of the pour ✅
09/27/2023

First part of the pour ✅

Back at this job 3 months later (after addition was finished) to add sidewalk and approach and they decided to do the wh...
09/26/2023

Back at this job 3 months later (after addition was finished) to add sidewalk and approach and they decided to do the whole driveway as well.
No problem, we've got you.

This was a terrible horrible. No good. Very stressful day...-The day started out with the weather man saying it wasn't g...
09/25/2023

This was a terrible horrible. No good. Very stressful day...

-The day started out with the weather man saying it wasn't going to rain... Instead it rained most of the day after they poured the concrete. Took forever to finish the concrete.
- The skid steer broke 😭
- I had to call Eric with the bad news that my car broke down and I was stranded with all five kids at the school.
- On the way up to get the skid steer fixed, we had a tire blow on the trailer
- On the way home from getting the skid steer fixed the brakes went out and his truck while hauling a trailer and the machine.

Some days are like that.
Thankful Eric is good under pressure and we have good friends to help.

Finally got to do the driveway, sidewalk and steps in the front. Then lots of clean up from all the rain that washed eve...
09/23/2023

Finally got to do the driveway, sidewalk and steps in the front. Then lots of clean up from all the rain that washed everything into the street.

Address

Midland, MI
48640

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Spearman & Sons Concrete and Excavation posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Spearman & Sons Concrete and Excavation:

Share