We finished up foundation on San Clemente project today. Strip forms and saw cut tomorrow. Starting Framing next Tuesday...
06/04/2026

We finished up foundation on San Clemente project today. Strip forms and saw cut tomorrow. Starting Framing next Tuesday. Ended up being 83 yards or concrete

First truck of the day.
06/02/2026

First truck of the day.

Project in San Clemente is coming along. Tons of rebar in this foundation. We just need to add dobies to the deck rebar ...
05/22/2026

Project in San Clemente is coming along. Tons of rebar in this foundation. We just need to add dobies to the deck rebar and add some diagonal stakes to forms. The forms took a beating from the helical pier contractor. We basically had to reset everything. Inspection and pour next week. Probably 80-90 yards.

Footings are all dug on San Clemente project. We got out first lumber lumber drop from Ganahl Lumber Company today. Form...
04/15/2026

Footings are all dug on San Clemente project. We got out first lumber lumber drop from Ganahl Lumber Company today. Form boards, Hardy templates and bolts and a roll or 15 mil Stego. Underground plumbing starting next week.

Demo is complete on San Clemente remodel. Working on grading the pad this week. Starting footings next week so helical p...
04/03/2026

Demo is complete on San Clemente remodel. Working on grading the pad this week. Starting footings next week so helical pier contractor can get their work done. It is a busy foundation with both slab and raised foundation and 8 Hardy panels on first floor.

After 2 years we finally got the permit for this project in San Clemente. We are tearing down most of the house and putt...
03/13/2026

After 2 years we finally got the permit for this project in San Clemente. We are tearing down most of the house and putting back a 3000 SF 2 story addition. We should have the rest of the house down tomorrow and will remove exisitng slab and footing Monday and Tuesday. Work on the foundation after that. The new foundation will consist of grade beams that set on helical piers. There are are 29 new helical piers that will go down to approximately 28 feet to reach bedrock. It is a lot of work just to get out of the ground.

We just finished up this custom ceiling wood install. 5 inch white oak T&G. We had it prefinished to eliminate the odor ...
01/20/2026

We just finished up this custom ceiling wood install. 5 inch white oak T&G. We had it prefinished to eliminate the odor for the owners. All the trim in ceiling went to black. Ceiling is about 850 SF 12 foot tall. We are doing exercise room walls and lid. We will have that wrapped up tomorrow with pictures to follow.

We finished framing this addition and remodel. New master suite and bathroom. We took out some bearing walls at covered ...
11/22/2025

We finished framing this addition and remodel. New master suite and bathroom. We took out some bearing walls at covered patio area to enlarge the kitchen with a new island. Doors and windows going in next week.

We got our slab poured last week, lumber drop today. Plating and layout today, frame walls on Monday.
11/08/2025

We got our slab poured last week, lumber drop today. Plating and layout today, frame walls on Monday.

We got inspection on this master bedroom and master bathroom addition today. We had to go back through planning after th...
10/28/2025

We got inspection on this master bedroom and master bathroom addition today. We had to go back through planning after the owner made some changes. Mud at 7am tomorrow to beat the heat.

Address

Murrieta, CA
92562

Alerts

Be the first to know and let us send you an email when Grattan Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Grattan Construction:

Share