AquaPoint

AquaPoint Advanced wastewater treatment system, design manufacturing and operation services.

Our in-house team is back onsite in Maine today to help the operator dial in the settings for the UV Pure Technologies D...
06/23/2026

Our in-house team is back onsite in Maine today to help the operator dial in the settings for the UV Pure Technologies Disinfection System. This is a two stage Bioclere system designed for 13,500 gpd & 15/15 treatment with disinfection. Serves the middle & elementary schools along with admin buildings.

It's (throwback) Thursday, we continue to manufacture & design systems across Tennessee, and schools are letting out all...
06/18/2026

It's (throwback) Thursday, we continue to manufacture & design systems across Tennessee, and schools are letting out all over the country...So why not combine all of that and show off one of our older wastewater treatment systems for The Page School down in Franklin. Four of our largest Bioclere units along with Primary & Flow EQ tanks from Xerxes!

Our largest Bioclere wastewater treatment plant installation to date! Pictured here are 7 of 7 Bioclere Units and 10 of ...
06/16/2026

Our largest Bioclere wastewater treatment plant installation to date! Pictured here are 7 of 7 Bioclere Units and 10 of the 11 ancillary tanks provided by Fiberglass Tank Solutions LLC for Pleasant Creek Subdivision in Thompson's Station, Tennessee. At full buildout the system will treat .126 MGD. We hope to have some updated pics from this site later this year, stay tuned!

A couple of perspectives via the drone at a Bioclere Wastewater Treatment Plant installed last year for Greystone Subdiv...
06/09/2026

A couple of perspectives via the drone at a Bioclere Wastewater Treatment Plant installed last year for Greystone Subdivision in Smyrna, Tennessee. At full buildout, this STEP system will treat about .110 MGD to 30/30 treatment for drip dispersal.

Last week we showed you a ground level pic of our system at Bledsoe Creek State Park just outside Nashville (last photo ...
06/05/2026

Last week we showed you a ground level pic of our system at Bledsoe Creek State Park just outside Nashville (last photo in today's post). But check out these drone shots from startup & operator training. This is a 11,500 gpd hybrid MBBR/Bioclere system for ammonia removal (< 0.9 mg/l) and UV disinfection (< 126 MPN/100ml). This system discharges to a recreational lake. Thanks to for those yellow boxes producing the necessary airflow!

Drone shots from startup last week at the MSAD 52 school district in Maine. This is a two stage Bioclere system designed...
06/03/2026

Drone shots from startup last week at the MSAD 52 school district in Maine. This is a two stage Bioclere system designed for 13,500 gpd & 15/15 treatment with disinfection. Serves the middle & elementary schools along with admin buildings.

The move is now official! Though as you can see from the photos, not exactly complete. But we are fully operational out ...
06/01/2026

The move is now official! Though as you can see from the photos, not exactly complete. But we are fully operational out of our new HQ at 597 Winthrop Street, Taunton Mass, 02780. Big shoutout to our internal operations team who handled the bulk of the heavy lifting, both literally and figuratively.

Last Thursday in our current New Bedford office before we finalize the move to Taunton calls for some throwback pics! Th...
05/28/2026

Last Thursday in our current New Bedford office before we finalize the move to Taunton calls for some throwback pics! The 1st photo is one of our very first Bioclere Units ready for shipment; and the 2nd is our founder, Craig Lindell, at an early 90's treatment site.

Sneak preview of our Bioclere AquaCELL MBBR hybrid wastewater treatment plant at Bledsoe Creek State Park in Gallatin, T...
05/26/2026

Sneak preview of our Bioclere AquaCELL MBBR hybrid wastewater treatment plant at Bledsoe Creek State Park in Gallatin, Tennessee. Expect more pics from this site early June as our Ops team will be there for startup!

We are going to take a mini social media break the next few days, but hope you and yours have a wonderful holiday weeken...
05/22/2026

We are going to take a mini social media break the next few days, but hope you and yours have a wonderful holiday weekend!

Address

39 Tarkiln Place
New Bedford, MA
02745

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+15089859050

Alerts

Be the first to know and let us send you an email when AquaPoint posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to AquaPoint:

Share