Foundation Constructors, Inc.

Foundation Constructors, Inc. Industry-leading company in deep foundation, pile driving and shoring. CA, USA

Foundation provides high-quality deep foundation, earth retention and ground improvement solutions utilizing industry le...
12/12/2024

Foundation provides high-quality deep foundation, earth retention and ground improvement solutions utilizing industry leading engineering, equipment, materials and technology.

10/21/2024

10/17/2024

Workday Development CenterPleasanton, CAFoundation’s team designed, engineered, and installed 2,100 24” drilled displace...
08/14/2024

Workday Development Center
Pleasanton, CA
Foundation’s team designed, engineered, and installed 2,100 24” drilled displacement sand cement columns for Workday’s Development Center in Pleasanton, CA. To confirm the column design, Foundation also conducted compression load tests.

Project: Equinix (Data Center)San Jose, CA2020Foundation installed 378 16” displacement auger cast piles at 60’ long. In...
08/12/2024

Project: Equinix (Data Center)
San Jose, CA
2020
Foundation installed 378 16” displacement auger cast piles at 60’ long. Included in the contract, tension and compression tests were conducted. Due to the project location, the piles were installed with existing structures.

Mission Rock, Parcel ASan Francisco, CA2020Foundation installed 468 14” H-piles in San Francisco. Foundation used a shro...
08/08/2024

Mission Rock, Parcel A
San Francisco, CA
2020
Foundation installed 468 14” H-piles in San Francisco. Foundation used a shroud to limit noise and disturbance, significantly reducing decibels caused by the hammer. To meet the project timeline, Foundation used two custom-built rigs.

Mission Rock, Parcel FSan Francisco, CA2022Foundation successfully installed 747 14” H-piles in San Francisco, CA. To li...
08/06/2024

Mission Rock, Parcel F
San Francisco, CA
2022
Foundation successfully installed 747 14” H-piles in San Francisco, CA. To limit noise and disturbance, Foundation used a shroud that significantly reduces decibels caused by the hammer. To meet the project timeline, Foundation used two of our custom-built rigs.

PG&E Gilroy, Pittsburg, CA2021Foundation installed TSP footing work at 5 towers and replaced the failing foundation for ...
08/01/2024

PG&E Gilroy, Pittsburg, CA
2021
Foundation installed TSP footing work at 5 towers and replaced the failing foundation for 1 tower. While most of the project was footing replacement, Foundation utilized custom-built equipment to install 4 30’ long Tubex piles.

SOMA Hotel, San Francisco, CA2020Foundation utilized both vibratory and driven methods to install 81,327LF of 14” H-pile...
07/30/2024

SOMA Hotel, San Francisco, CA
2020
Foundation utilized both vibratory and driven methods to install 81,327LF of 14” H-piles for a new hotel in San Francisco, CA. This included a pile indicator program in which each pile was up to 235’ in length requiring splicing in locations per pile.