06/03/2026
Progress update on an ongoing project.
This project included sheeting three sides of the building, installing C-purlins, framing openings for four overhead doors and a walk-in door, and constructing a new driveway with geotextile fabric and road base.
The building is taking shape, and the overhead doors are next.
We look forward to sharing the finished project soon.
📞 (940) 273-1104