09/02/2026
✅ Another successful AQUIS installation completed!
Our team recently completed a comprehensive air handler restoration project, helping enhance system performance, durability, and protection.
Scope of services completed:
✔️ Cleaned and prepared air handler surfaces for AQUIS installation
✔️ Applied AQUIS CPR-SL Epoxy (Self-Leveling) at 3/16” on chamber floors
✔️ Applied AQUIS Fire Barrier to support NFPA 90A fire code compliance
✔️ Applied AQUIS Waterproof / Antimicrobial Topcoat to seal and protect the system
✔️ Applied Foster 40-20 Multi-Acrylic coating to chamber walls, ceilings, and fan housing
From surface preparation to final protective coatings, every step was completed with attention to quality and long-term performance.
At AQUIS, we’re committed to delivering solutions that help protect critical HVAC systems and keep facilities operating at their best. Contact us today for a free assessment.