09/24/2026
Temperature first. Flooring second. 🌡️
Before installing a flooring system, measuring the concrete temperature is essential. Surface temperature directly affects the working time, curing, and adhesion of epoxy, urethane, and other coatings.
A surface that is too hot or too cold can cause the material to cure too quickly, too slowly, or even compromise its bond to the concrete.
A quality installation doesn’t begin when the product is applied—it begins by verifying the substrate conditions.
407-637-6811
Central Florida