04/27/2024
It took a lot of designing, elbow grease, and cussing, but we managed to finish this complete HVAC install for an 1800s barn being converted into an event center. 3 zone mini-split system for the offices and a 5 ton ducted heat pump system. We performed both system and ductwork design to great results. Barn went from 54⁰ to 60⁰ in only 30 min. Swipe for all pics.