Setting structural steel at this scale requires more than a crane and a crew.
Every lift starts with a load calculation and a rigging plan. The assembly sequence is engineered before the first piece leaves the ground because the order steel goes up determines how the frame stabilizes at each stage.
Have you worked on a project where the assembly sequence had to change mid-build? We would like to hear what drove the change.