10/27/2026
QUESTION: How many operator hours should it take to produce 80 interlocking board and batten panels, 24 gauge and 18 feet long, with SWI Duplex Automation?
ANSWER: ZERO.
That’s right. 80 panels, fully automated, with zero operator hours required for production.
Packing them all up is a little hectic, though!
SWI Machinery — Automation that delivers.