05/28/2026
Discover how Aura Engineering completed the engineering design of a 1.5 million bbl expansion at this terminal facility!
We completed the process, mechanical, electrical, civil, and structural engineering design of a 1.5 million bbl expansion at the Seabrook Terminal located in the Houston Ship Channel. This facility expansion consisted of ten new above-ground, internal-floating-roof tanks and was designed with a redundant pump manifold capable of flow rates up to 30,000 barrels per hour.
Explore this project: https://go-now.co/4uq7Cxc