Project of ours we started at beginning of year, we cleared the site and had a ton of rock to manage, we were able to use rock as fill in low areas and break up the rest to work with. We then dug out roughly 250+ loads of dirt out beside the existing pond to haul to the cleared site up above it.
Came back in to break the dam between the two ponds and create one larger pond area