12/30/2018
Stacks of material and we barely made a dent with this portion complete. Two 12 bay long doubles were erected, and 2 bays were added to the systems we installed last year. So far 112 frames, 1,050 beams and decks, 174 12” spacers. 4,896 sets of hardware and 224 anchors were tightened. On to part 2