Lipkvich Fabrication

Lipkvich Fabrication Located in Pittsfield Maine, if we cant help you we probably know who can. offering bending, welding and machining services in shop and mobile across Maine!!!

We strive to be your premier one-stop-solution for dock, handrail, and general fabrication needs. Our team has built a solid reputation for high quality and efficient work. When you hire us to complete your project, you can expect nothing less than quality work and friend service. Feel free to give us a call today to discuss your project needs in Pittsfield, ME, and the surrounding areas.

08/08/2026

Just because its an old roll off trash truck doesn't mean it cant be bad ass!
After getting the back of the truck pressure washed, we went ahead and did a first stage blasting, just to see where we were at.
Next removed the old rotten bumper. It was so packed full of solidified dumpster mung I couldn't get the lights out without beating the bumper with a hammer. Doing that opened up some large holes in the bottom allowing the sludge and rust to exit, once the lights were removed. They all worked so we saved the customer a few hundred dollars on lights by cleaning and reusing them.
Reasonably clean, but still pretty gross I snaked the harness out through the grime.
I chose to do most of the removed with an angle grinder, because the smell of just the truck was pretty bad and I really didn't want to smell that s**t on fire 🤣.
Once I got most of it ripped off with the angle grinder and a whiz wheel I went in and gouge the rest off with the plasma.
All the bad metal removed I sand blasted again to get everything clean and prepped for paint and weld.
But a clean hitch plate still needs a bumper. So over to big red to cut some light holes out of 6x6/.25 box tube.
I made some paper templates for the angles and notches. I relieved the notches with big red while cutting the light holes, this made my bends super easy by hand. Welded it all out, and ground the radiuses of the tube back in.
Welded the bumpers onto the truck, sand blasted one more time to get the new bumpers ready for primer.
Washed the whole area down with denatured alcohol and sprayed it with a special 4 part epoxy primer. The customer is going to paint over it, but they wanted my primer on it.
Job done well is a job well done.
For all you big truck fabrication needs call Lipkvich Fabrication and check out some lf our other projects at
Lipkvichfabrication.com

06/05/2026


Justin Lipkvich at Lipkvich Fabrication

Little foot Being all majestic.    !!!
04/28/2026

Little foot Being all majestic. !!!

Long day today. Bought the wrong blasting grit. and made it work, but slower than expected. Was sent the wrong blade for...
04/24/2026

Long day today. Bought the wrong blasting grit. and made it work, but slower than expected. Was sent the wrong blade for the computer saw. Tried to bottom out the adjustment and found out the adjustment was stripped so that's a morning project now. Luckily The iron worker is still a tank so we'll make out cuts on that tomorrow. Oh and I got to spend 100 dollars on diesle for the heaters because the primer we are using is super temp sensitive. 70 degree minimum. Tomorrow is gonna be busy. Hopefully I ca get some footage to edit. and get some product out the door. Got a good helper getting us back on track. Thanks Tmac Oh and heres a picture of a grate for a commercial smoker we made a while back.

04/22/2026

I cut the ... I bend the metal. sometimes I the metal.

04/19/2026

Heading out at 3ish am tomorrow. Gonna be a long day.

04/13/2026

Getting after it on the iron worker!! Stay tuned for the weld out coming monday night!! Hit them buttons!!! L,S,F!!!

04/13/2026

We have a job right now to.make some custom ladders, railings and stairs for the new Connors Emerson school in . Working with the fine folks at Write Ryan and SBL. Excellent companies to work with. These prices of channel are bingo punched to accept ladder rungs via our print packet. The machine doing the work is a late modle Hill Acme . The Jig being used is a self referencing spring loaded pin jig which locates each hole nearly almost exactly 12" on center. It takes approximately 10 seconds per repetition assuming the channel slides through the stripper jig nicely. The hole size is 1.125" and the thickness is approximately 3/16". The Hill Acme is unaware that there is anything in its way. Stay tuned for the fit up and weld out!! Hit that Like and Share!!

Address

Greely
Pittsfield, ME
04967

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm
Sunday 9am - 5pm

Telephone

(207) 735-6526

Alerts

Be the first to know and let us send you an email when Lipkvich Fabrication posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Lipkvich Fabrication:

Shortcuts

Share