06/03/2026
✅ Two medical facilities.
✅ Two of healthcare construction’s most complex project types.
✅ Both delivered on time and on budget to satisfied clients.
In the first few months of 2026, our Cannon Building teams completed an MRI replacement at the MemorialCare Long Beach Medical Center and a Linear Accelerator installation at Huntington Hospital’s oncology center. Kevin Crider and Jack Weaver guided their respective teams to deliver products to support two critical health care centers in Southern California.
Their edge? Constant communication with the client and subs, problem-solving agility, and strong teamwork. Shoutout to our key partners on both projects—we couldn’t have done it without you! For Long Beach Medical Center: Architects of Orange, MHP Structural Engineers, and MRI Corp. And for Huntington Hospital: Myng Architects, Degenkolb Engineers, and Varian.
32 years of Southern California healthcare expertise. Built one project at a time. Congratulations to the MCLBMC and HH teams!
Want a closer look at how these projects came together?
👉 Read the full story on our blog: https://cannonbuilding.com/precision-under-pressure-cannon-building-delivers-two-complex-healthcare-projects/
See how Cannon Building completed two complex healthcare projects—a hospital MRI replacement and LINAC installation—while maintaining uninterrupted patient care.