10/02/2026
Ossining High School – Locker Room Renovation / Addition – Demo work is well underway for the new state-of-the-art locker rooms and addition at Ossining High School.
Formwork will soon begin for the columns that will support two new additional floors above the locker room space.
This required designing new steel columns to extend down through the new locker room space on the first floor while maintaining the original one-story roof structure that will become the new second-floor fitness area.
Visit us online: https://connollyengineering.com