09/05/2026
On a retaining job the schedule lives or dies on the wall going up straight and fast. G-Force from -bloc is built for structural retaining runs, so the crew can course a load-bearing wall without turning every lift into a decision.
The time you save is not in the laying, it is in not re-checking your line every third course.
Sending a retaining wall out to bid soon? Send us the site plan and we will spec it with you.