11/14/2026
Just a few pictures from one of the jobs going this week. I thought after seeing these pictures that it would make a good informative post. This job was supposed to be a “light” remodel. We were going to remove the stalls, touch up the drywall, upgrade lighting, paint, set a new vanity, and be gone. But, that wasn’t the case. Every thing we do is a variable. You can do your best to look at a job, estimate a time frame, and schedule. But, more times than not, it doesn’t work that way. A few minutes into the demo, we found a soft spot in the floor, and that led to the discovery of some rotten layers of subfloor that led into tearing out 100 years of “cover ups”. The plumber discovered a crack in the cast iron sewer pipe, and that turned into a complete replacement of the sewer line to outside the building. Then, that turned into a few more days’ work. Regardless of schedule and time frame, we will always make sure the job is done correctly. So many variables go into a job. Will we get materials on time? Will they arrive damaged? Will the subcontractors show up as scheduled, or will they get hung up on another job? Will the home owner add more work while we are there? And, the list goes on and on. So, if you have someone in ANY trade hired, be patient. And. this applies to contractors, HVAC, plumbing, etc. Most people go to a 9 to 5 job, and they know exactly what they will be doing every day and the exact same time day after day. In the trades, we do not have one single thing guaranteed day to day, and things change by the minute. Being able adapt and make changes on the go is one of the absolute most important skills one can possess while working in the trades. Communication with the homeowner and subcontractors through problems and changes is a must as well.