05/28/2026
We are still working on 2025 projects. This is one in Lewiston of a 3 1/2 story apartment building. We installed firewalls, fire doors with door closers. In six apartments, we took out doors and made firewalls. Painted three  hallways that were 90 feet long each. Tore out carpet from all hallways and flooring from all landings and stair treads and installed all vinyl plank, flooring and vinyl stair treads throughout.