Tejjy Inc.

Call Directions Website Contact the business

Tejjy Inc. Tejjy Inc. is an 8(a) certified, women-owned business offering BIM and VDC services for the AEC industry.

We specialize in 3D laser scanning, clash detection, MEP coordination, and permit-ready designs, ensuring precision and sustainable solutions. is an 8(a) certified, women-owned business delivering top-tier Building Information Modeling (BIM) and Virtual Design and Construction (VDC) services for the Architecture, Engineering, and Construction (AEC) industry. Specializing in 3D laser scanning, clash detection, MEP coordination, and permit-ready design solutions, we bring precision and efficiency to residential and commercial projects. Our BIM services support every stage of construction, from 3D modeling to 4D scheduling and 5D cost estimation, as well as 6D facility management for sustainable, green building environments. With a mission to elevate project quality, we transform 2D concepts into immersive 3D models, ensuring seamless coordination and accuracy.

📞 Contact us at 202-465-4830
✉️ Email: [email protected]
🌐 Visit: www.tejjy.com

Let Tejjy Inc. bring your project vision to life with the best in BIM and 3D laser scanning solutions.

10/16/2026

Heritage BIM Helps Preserve Historic Buildings Without Disturbing Their Souls
At Cemetery Lane, the restoration proposal arrived with a cheerful promise: “We’ll make it feel like new.”
Two fingers snapped. The proposal disappeared. The family preferred its ancestral home with its history attached.
Heritage BIM (HBIM), 3D laser scanning, and historic building documentation help architects and preservation teams understand original details and past alterations before planning restoration.
Tejjy helps document that history with care. Give us a ring. A disembodied hand can only handle so much paperwork.

10/13/2026

More ground covered. More site context captured. Better information for renovation planning.
Tejjy has added NavVis VLX 3 to its reality capture arsenal, expanding how we document complex AEC facilities and bring measured existing conditions into planning and design.
From university buildings and commercial properties to industrial facilities, mobile scanning helps our team capture accessible spaces while working within occupied-site constraints and limited access windows.
Detailed point clouds and panoramic imagery support Scan-to-BIM, as-built documentation, and project reviews, giving architects, engineers, owners, and contractors a clearer understanding of existing layouts and spatial constraints.
Tejjy’s reality capture and BIM expertise turns captured site information into deliverables project teams can use.

New horizons begin with the curiosity to look closer and the courage to imagine what comes next. 🇺🇸This Columbus Day, Te...
10/12/2026

New horizons begin with the curiosity to look closer and the courage to imagine what comes next. 🇺🇸
This Columbus Day, Tejjy celebrates the spirit of exploration that inspires fresh ideas, thoughtful design, and better ways to build. In the built environment, discovery can begin with an overlooked detail, a different perspective, or a possibility waiting to take shape.
Each project gives us an opportunity to ask more, understand more, and turn what we learn into spaces that serve people better. Here’s to staying curious and bringing purpose to every new direction.

10/11/2026

This Navratri, We Remember Where Our Story Began.
Our name, Tejjy, draws inspiration from Maa Vaishno Devi. That connection makes Navratri deeply personal to us. It brings us back to our roots, to faith, and to the hopes we carry into every new beginning.
The temple taking shape in points of light reflects that bond between our heritage and our work. A sacred place holds more than its walls. It holds whispered prayers, cherished memories and the hope people bring through its doors.
May Maa Durga’s blessings bring comfort to those facing uncertainty. May they give strength to those beginning again. And may these nine nights bring you closer to the people and places that make you feel at home.
Wishing you and your loved ones a blessed Navratri, from all of us at Tejjy.
Read the story behind our name.https://www.tejjy.com/origin-of-tejjy/

Scan-to-BIM for Renovations: Find the Gap Between the Drawing and the BuildingThe scariest thing on a renovation project...
10/09/2026

Scan-to-BIM for Renovations: Find the Gap Between the Drawing and the Building

The scariest thing on a renovation project may be an as-built drawing everyone trusts, until demolition reveals something different.

For architects, engineers, general contractors and MEP teams, field verification can help clarify existing conditions before design decisions and installation plans move forward. 3D laser scanning captures the site as it stands; Scan-to-BIM turns that data into a usable model for renovation planning and coordination.

Give your team a clearer view of the building before the surprises show up.

Explore: https://www.tejjy.com/our-services/bim-services/3d-laser-scanning-services/

10/05/2026

BIM Helps Carry Architectural Design Intent Into Construction
A roofline, an open space, a carefully proportioned façade. Every architectural decision has a purpose. Carrying that purpose into the finished building takes collaboration across disciplines.
This World Architecture Day, we celebrate architects, and the coordination that helps their ideas take shape.
For architects, engineers and general contractors, architectural BIM brings design decisions into a shared context. Structure, building systems, clearances and construction details can be reviewed together, helping teams address constraints while protecting the qualities that define the design.
Tejjy connects architectural engineering with BIM/VDC support to help project teams translate design intent into coordinated models and construction documents.
Celebrate the vision. Coordinate the details that bring it to life. Explore Tejjy’s architectural engineering and BIM support.

10/02/2026

Tejjy Welcomes Fall With Festive Energy and a Focus on Smarter Construction
A little seasonal spirit. A fresh look. And a month of conversations about the surprises construction teams would rather catch early.
This October, we’re putting missing as-builts, undocumented field changes, late coordination conflicts and incomplete handover data in the spotlight. These project “ghosts” can leave general contractors, trade teams and owners facing difficult decisions when work is already underway.
Throughout the month, we’ll explore how BIM and reality capture services help teams verify existing conditions, review constructability and prepare useful construction documentation, from commercial renovations to federal, healthcare and mission-critical facilities.
Expect practical insights, familiar field challenges and a Halloween twist as the month unfolds.
Welcome to fall at Tejjy. Let’s find what’s hiding before it haunts the project. Explore the BIM/VDC support behind the series.

On Gandhi Jayanti, we honor Mahatma Gandhi’s enduring message of truth, nonviolence and service.His legacy invites us to...
10/02/2026

On Gandhi Jayanti, we honor Mahatma Gandhi’s enduring message of truth, nonviolence and service.
His legacy invites us to bring patience to our differences, integrity to our decisions and care to the communities we share.
May his ideals continue to inspire kindness in our actions and respect for one another.

10/01/2026

BIM/VDC Support for General Contractors Starts With Finding Risks Before Mobilization
October brings scary stories. Construction has its own: an undocumented pipe, an uncoordinated pe*******on, or a model that looks complete until installation begins.
For general contractors managing complex renovations and occupied facilities, these project “ghosts” can become RFIs, rework and schedule disruptions.
Effective preconstruction BIM starts with a defined scope: which existing conditions need verification, what details trades need for installation, and who resolves coordination issues before fabrication. Whether managed internally or through outsourced VDC support, the deliverables should help teams make those decisions.
Reality Capture → BIM/VDC → Constructability Review → Coordinated Delivery

This October, Tejjy is putting hidden conditions and unresolved construction details under the spotlight, before they reach the field.
Explore Tejjy’s preconstruction BIM services. What project uncertainty would you most want resolved before mobilization?

MEP Coordination Helps Federal Facilities Verify Emergency Shutoff Access Before Handover An emergency is a poor time to...
09/30/2026

MEP Coordination Helps Federal Facilities Verify Emergency Shutoff Access Before Handover

An emergency is a poor time to discover that a shutoff valve is behind equipment, or that its label no longer matches the drawings.
For federal facility owners, general contractors, MEP trades, and commissioning teams, the review needs to connect three things:
Location: Does the installed shutoff match the coordinated model and asset record?
Access: Can personnel identify and reach it with equipment, doors, and finishes in place?
Operation: Has the responsible team tested its function and documented what it isolates?
3D laser scanning and as-built BIM can help verify visible locations and surrounding clearances. Functional testing confirms whether the shutoff performs as intended.
Before handover, walk the emergency isolation routes with the people who will operate the facility. Record discrepancies while the construction team can still resolve them.


Address

1 Research Court Ste 335
Rockville, MD
20850

Alerts

Be the first to know and let us send you an email when Tejjy Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Tejjy Inc.:

Shortcuts

Share