Tejjy Inc.

Tejjy Inc. Tejjy Inc. is an 8(a) certified, women-owned business offering BIM and VDC services for the AEC industry.

We specialize in 3D laser scanning, clash detection, MEP coordination, and permit-ready designs, ensuring precision and sustainable solutions. is an 8(a) certified, women-owned business delivering top-tier Building Information Modeling (BIM) and Virtual Design and Construction (VDC) services for the Architecture, Engineering, and Construction (AEC) industry. Specializing in 3D laser scanning, clas

h detection, MEP coordination, and permit-ready design solutions, we bring precision and efficiency to residential and commercial projects. Our BIM services support every stage of construction, from 3D modeling to 4D scheduling and 5D cost estimation, as well as 6D facility management for sustainable, green building environments. With a mission to elevate project quality, we transform 2D concepts into immersive 3D models, ensuring seamless coordination and accuracy.

πŸ“ž Contact us at 202-465-4830
βœ‰οΈ Email: [email protected]
🌐 Visit: www.tejjy.com

Let Tejjy Inc. bring your project vision to life with the best in BIM and 3D laser scanning solutions.

🏒 Does your BIM model work as hard as your team does?\Most projects stop at basic 3D coordination. But the most successf...
06/10/2026

🏒 Does your BIM model work as hard as your team does?\

Most projects stop at basic 3D coordination. But the most successful ones go further - using BIM as a live decision engine and even a Digital Twin that optimizes the building long after construction ends.

At Tejjy Inc., we structure BIM into 3 clear maturity levels:
βœ… Level 1 – Coordination Model β†’ Clash detection, 3D visualization, reduced RFIs
βœ… Level 2 – Decision Model β†’ 4D scheduling, 5D cost tracking, carbon & sustainability analysis
βœ… Level 3 – Living Model (Digital Twin) β†’ Sensor-fed data, predictive maintenance, asset lifecycle intelligence

Whether you're a contractor, owner, or federal agency β€” we build the BIM maturity your project actually needs.

πŸ’¬ Comment "BIM" below and we'll send you more info!
🌐 Learn more: www.tejjy.com/our-services/bim-services/

The Northeast Water Purification Plant expansion is one of the most mechanically complex water infrastructure projects u...
06/08/2026

The Northeast Water Purification Plant expansion is one of the most mechanically complex water infrastructure projects underway in the region. The scale of coordination required, across piping systems, structural interfaces, and utility routing, leaves no margin for the kind of conflicts that get resolved informally on simpler jobs.

Tejjy was part of that project. LOD 450 modeling, MEP piping coordination, and clash detection applied at a level where the model isn't a visualization tool, it's the engineering record the field team builds from.

That work has now entered the larger industry conversation. Tejjy's contribution has been documented and published as part of a water infrastructure feature, putting digital engineering's role in critical utility construction on record for the broader AEC community.

Infrastructure at this scale deserves that visibility.
Read here: https://www.kelmanonline.com/httpdocs/files/WVAWWA/mountainwater2026-issue1/index.html

06/05/2026

Every structure we help design leaves a mark on the world. On World Environment Day, we're reminded that how we build matters as much as what we build.
At Tejjy Inc, precision goes beyond accuracy; for us, it's about reducing waste, minimizing rework, and making smarter decisions before a single material hits the site.
A better-built environment starts with a better-planned one.
Happy World Environment Day.

06/01/2026

June has always been the month of change. Longer days. Shifting seasons. The moment nature decides it's time to become something more. We feel that too.
At Tejjy Inc, June marks a deliberate evolution, from delivering BIM coordination and VDC services on federal and commercial projects, to becoming a full-spectrum geospatial intelligence partner for the built environment.

We started with BIM, meeting GSA BIM Ex*****on Plan requirements, resolving MEP clashes, and coordinating federal facilities across the DMV region before a single contractor stepped on site.

Then came Digital Twins, giving those models a heartbeat. Connecting BIM deliverables to real-time facility data, turning handover models into living operational systems.

Then GIS and geospatial intelligence, the layer beneath everything. Mapping flood risk, utility corridors, and site constraints to meet DOT GIS strategic plan and federal GIS requirements from concept stage.

And now: Geospatial Twins, where GIS site intelligence and digital twin technology converge into one living, intelligent system for infrastructure and facilities. That's not an upgrade. That's a metamorphosis. This June, we're sharing that journey, and where BIM, GIS, and digital delivery are taking the built environment next.

Our Building Digital Metamorphosis starts here.

05/31/2026

20 years ago, we asked a question.
Today, the journey itself is the answer. πŸš€
From vision to global impact, this is more than growth, it’s legacy in motion.

In most construction projects, "fix it later" is an inconvenience.In public-sector buildings, it's a crisis.Rework in a ...
05/29/2026

In most construction projects, "fix it later" is an inconvenience.
In public-sector buildings, it's a crisis.
Rework in a federal courthouse means navigating security clearances before a crew can re-enter the floor. A missed coordination clash in a government facility means phased approvals restart, not reschedule. An access control conflict doesn't get patched in a change order. It triggers a compliance review.
The physics of rework are the same. The consequences are not.
Public-sector construction operates inside a layer of constraints that private projects rarely face: Security zones that dictate who can be where and when. Multi-agency approval chains that don't compress under schedule pressure. Phased construction sequences locked by occupancy, not convenience. Access control systems that treat an uncoordinated pe*******on as a vulnerability, not a punchlist item
This is precisely why BIM coordination in government projects isn't a value-add. It's risk mitigation with a deadline.
Every clash resolved in the model is one that never meets a security checkpoint. Every coordinated phase is one that doesn't trigger a re-approval cycle.
"Plan early" isn't a slogan in public-sector work. It's the only viable strategy.
The margin for error in these buildings was never there to begin with.
See how it was done - www.tejjy.com/project/bim-services-rockville-district-court-house/

05/27/2026

Substation upgrades do not begin with design. They begin with accuracy.

In high-density MEP environments, every pipe route, equipment clearance, duct connection, and service zone carries constructability risk. When existing conditions are unclear, coordination becomes reactive. And reactive coordination is expensive.
That is where Scan to BIM changes the delivery conversation.

By converting laser-scanned field data into coordinated BIM intelligence, project teams can validate MEP geometry, identify spatial constraints, and make informed decisions before work moves deeper into design or construction.

For critical utility infrastructure, this is not just documentation. It is risk control.
Tejjy supports infrastructure projects with reality capture, point cloud processing, MEP coordination, and BIM-driven digital delivery that brings field conditions into the model early.

See how this approach translated into As-Built MEPF BIM delivery for the Naval Yard project in Washington:
https://www.tejjy.com/project/as-built-mepf-bim-services-for-naval-yard-project-washington/


05/26/2026

Twenty years ago, we weren't sure we were ready.
Mission-critical work has a weight to it that you can feel before you fully understand it. In 2006, Tejjy was asking honest questions, about the stakes, the responsibility, the technical demands of projects where failure isn't an option.
We didn't have all the answers then.
We built them. Project by project. Year by year.
That's the thing about readiness, it's never handed to you. You earn it through the work. Through the projects that pushed us. Through the clients who trusted us when the stakes were highest. Through two decades of showing up for mission-critical infrastructure when it mattered most.
Twenty years later, the questions are bigger. So are we.
Here's to 20 years of Tejjy. πŸ‡ΊπŸ‡Έ

Watch our full story: https://youtu.be/ANfi-Sr_9Uw?si=vNhGIaaCsoWy63pI

05/25/2026

This Memorial Day, Tejjy pauses to honor the men and women who gave their lives in service to the United States. Their sacrifice is not just a part of history. It is part of the foundation on which communities continue to stand, grow, and move forward.
As builders, designers, engineers, and planners, we understand that strong communities are shaped by more than structures. They are shaped by courage, service, and the responsibility to protect what matters.
Today, we remember the fallen with gratitude. We honor their legacy with respect.

05/22/2026

Transit construction has one rule most projects do not:
The building cannot stop breathing.
Trains arrive. Platforms fill. Utilities stay live. Public movement keeps rewriting the edge of the jobsite.
That is why BIM for transit is not just a coordination model. It is a rehearsal space for disruption.

Before a team touches the station, the model can expose the collision nobody wants to discover at 2 AM.

The duct route that blocks access.

The utility conflict beneath a platform.
The sequence that looks fine on paper but fails in a live passenger environment.

In active infrastructure, the smartest construction decision is often the one made before construction begins.

Tejjy brings BIM coordination, clash detection, and sequencing intelligence to transit projects where downtime is not an option.

Check out the project here - https://www.tejjy.com/project/metro-station-project/

Address

1 Research Court Ste 335
Rockville, MD
20850

Alerts

Be the first to know and let us send you an email when Tejjy Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Tejjy Inc.:

Share