05/05/2026
Another new construction on the water at Isle of Palms. We are installing all Heil 2 stage Coastal coated condensers with variable speed air handlers for proper dehumidification control with all the humidity here. All duct downstairs is getting sealed with closed cell spray foam that will not cause any duct sweating under the house. We install returns in every bedroom instead of flex jumpers and even seal all our floor boots so no dirt and debris gets in our ductwork during construction. Having a contractor who puts in the right equipment, properly designed and properly installed is key to such a big investment!