Another solid job by the Brocity Construction & Welding crew 💪
We were brought in to install a cow foot bath in the exit alleyway of a dairy—an essential feature to help maintain the health of the cows’ hooves.
With the dairy shut down for just an hour and a half, time was critical. Our team jumped into action and got it done fast and efficiently:
• Set forms
• welded baseplates installed post
• Drilled and tied rebar
• Mixed, poured, and finished concrete
• weld
• Capped and cleaned up
The. The crew came in and got it striped and set epoxy for longevity.
All completed in just about 2 hours to get the dairy back up and running as quickly as possible.