Tamm Construction

Tamm Construction From footings to finish...and everything in between.

01/02/2026

Happy New Year!!! Here is a recap from last year's projects. Let us know if you want to get on our schedule for your project in 2026.

Always satisfying to finish up a job on a Friday.  Upgraded this bathroom with a Flexstone Shower System, new toilet, fl...
09/20/2025

Always satisfying to finish up a job on a Friday. Upgraded this bathroom with a Flexstone Shower System, new toilet, flooring and vanity top. A very budget friendly face lift.

07/23/2025

Contact us if you have been affected by the recent hail storms. We are here to help. No hassle, no haggle; you won't sign a contract until your claim has been approved by your insurance company.

Found some more structural damage this week.  It was the result of a dryer vent that was pointed up.  All that warm mois...
07/19/2025

Found some more structural damage this week. It was the result of a dryer vent that was pointed up. All that warm moist air was blowing against cold steel siding in the winter causing condensation behind the siding. No moisture barrier behind the siding; let the rotting begin.

From one project to the next; started an exterior remodel today. This will be an amazing transformation…stay tuned.
07/15/2025

From one project to the next; started an exterior remodel today. This will be an amazing transformation…stay tuned.

Finished this fun pole shed last Friday.  Always great to end a project on a Friday.
07/15/2025

Finished this fun pole shed last Friday. Always great to end a project on a Friday.

We poured the floor yesterday and started putting steel on today. It’s final starting to look like something.
07/08/2025

We poured the floor yesterday and started putting steel on today. It’s final starting to look like something.

Perlins on yesterday, soffit and facia today.
06/17/2025

Perlins on yesterday, soffit and facia today.

Trusses are up.  Just in time for some rain.
06/12/2025

Trusses are up. Just in time for some rain.

Finally framing.  It was a good day.
06/11/2025

Finally framing. It was a good day.

We started a new 30’x40’ pole shed.  During the planning stages of this build, I discussed with the customer the idea of...
06/06/2025

We started a new 30’x40’ pole shed. During the planning stages of this build, I discussed with the customer the idea of installing an air to air geothermal system that I heard about five years ago and I’ve always wanted to try. The customer was excited about it so gave us the greenlight. We installed 300 lineal feet of 4 inch PVC pipe 6’ below grade from one corner of the building to the other. After we got done installing the pipe I put a leaf blower on one end and a meat thermometer on the other. Pushing the ambient air through the loops cooled the air from 74° to 63° in one single return. Once completed, the building will benefit for both heating and cooling purposes with minimal energy consumption.

Had an interesting landscaping job we finished up today.  Customer had a dead oak tree which we cut into stepping blocks...
05/30/2025

Had an interesting landscaping job we finished up today. Customer had a dead oak tree which we cut into stepping blocks and chipped the wood for a walking path. Also brought in the brush cutter to mow down the undergrowth. And per usual, I have no before pictures. Fun little project to create a really nice and peaceful fern/creek oasis.

Address

2905 18th Street S
Saint Cloud, MN
56301

Alerts

Be the first to know and let us send you an email when Tamm Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share