* We haul all the components of concrete on our truck and mix on your job site, guaranteeing that you are getting the freshest concrete possible and only paying for what you need.
* At Card Mini Mix, we've got you covered. We've run small-town businesses for 30 years, delivering what we say we will with quality and customer service. Our mix-on site concrete offers a unique system that provides s
mall yardage deliveries. We are dedicated to producing high-quality products and will deliver them right away, eliminating all the labor of mixing concrete yourself as well as clean up!
* All orders are custom mixed on-site. Our trucks mix standard specifications of 2500 psi-5000 psi and we also make a variety of specialty mixes. In addition to our 3/4″ round concrete rock, we also have pea gravel (3/8 buckshot) and 1/2″ round concrete rock available upon request. Here are some examples:
2500 PSI: Fence posts, rat slabs (slab that is used under tile flooring), post holes for pole barns
3000 PSI: personal sidewalk, footings, patios, dog runs, trash slabs, shed slabs, pier pads, steps
3500 PSI: city sidewalk, driveways, approaches, footings, foundations, retaining walls, garage floors, hot tub pads
4000 PSI: RV slabs, shop floors, etc. Delivery Information:
Delivery:
Normal Delivery Schedule: Monday -Friday, 7 am – 4 pm
Delivery Information and Fees
Saturdays: $75
Weekdays after 4 pm: $90
Weekdays after 7 pm: $270.00
Saturdays after 4 pm: $270.00
Sundays $375.00
Holidays or any night from 10 pm – 5 am: $375.00
Deliveries beyond metropolitan area: $8 per mile for each mile beyond specified mileage point. *2 yard minimum order for some areas*
Unloading Time: Ten (10) minutes per cubic. Cancellation: We require 4 hours’ notice (except for inclement weather: 2 hours.) Show up/No Delivery Charge: $150.00
Metered Delivery:
All our concrete mixes are metered off the truck rounded up to the nearest 1/4 yard. We can deliver as little as a few bucketfuls or as much as you need. You pay only for what you use (1/2 yard min. out of town.) There is never any “leftover” concrete dumped at your job site. Maximum delivery is 8 cubic yards per trip.