09/29/2026
MME engineered the Lee Road Trail project for the City of Watsonville Public Works Department to provide high school students and Watsonville residents a path from Pajaro Valley High School to a wetland trail network coming soon at the Watsonville Slough Farm and beyond. This is the first phase of a trail connection to improve pedestrian and bicycle routes to the high school. Design features include a pervious concrete trail to protect adjacent wetland water quality, new sidewalks, crosswalks, and bike lanes at the school frontage for students, and traffic safety upgrades in front of the school.