08/19/2026
Two more S.C.S bathrooms revived with partial renovations to each of them. The upstairs tub bathroom we installed new tile in the shower, Coretec Vinyl plank flooring over the existing tile & installed a new threshold to match. water fixtures & completed with a fresh paint job.
The lower main bathroom we converted the tub to a shower, installed new fixtures, tile, frameless shower door & a fresh coat of paint.