04/23/2026
90 minutes. Full Install. Built under pressure.
At the CISCA - Ceilings and Interior Systems Construction Association Contractor Challenge, teams in Heat 1 took on a fast-paced ceiling installation using products from our aCapella PET lineFloat Clouds and Shapes-coming together to form a striking, tree-inspired structure overhead.
Congratulations to the teams for an impressive build and strong ex*****on under tight timelines.
We’re proud to sponsor the heat and provide the materials behind the installation. It was great to see aCapella in action on the floor.
Architecture