SCI Infrastructure, LLC is a SeaTac, Washington–based heavy civil and road contractor serving public and private clients across the Puget Sound region and Pacific Northwest, specializing in underground storm and waterline systems.

New Project 2602: Pershing Street Stormwater Retrofit Project 🎉We are super excited to share that we will be a subcontra...
03/18/2026

New Project 2602: Pershing Street Stormwater Retrofit Project 🎉
We are super excited to share that we will be a subcontractor to Selland Construction in Wenatchee. This project is set to kick in from Spring 2026- Summer 2026 This is located in Wenatchee and the pershing street basin is approximately about 55 acres of fully developed residential neighborhoods and runoff is predominantly surface flow. The main pollutant of concern is sediment, which may contain heavy metals and legacy pesticides. The project goals for this project are to Increase water quality that goes to the Columbia river, treat stormwater runoff from streets, improve flooding in the areas, and replace old 6 cast iron water main with new 8” ductile iron water main. This project will reduce flooding risk, improving the quality of the stormwater discharged to the Columbia River, protecting recreational areas used for swimming, and beneficial for the protection of salmon/ shoreline habitats. We are waiting on approval from the Department of Ecology to fully design the planning grant.

Our Spring Newsletter is here! 🌸We’re excited to share updates across SCI Infrastructure. This edition highlights projec...
03/16/2026

Our Spring Newsletter is here! 🌸
We’re excited to share updates across SCI Infrastructure. This edition highlights project progress, important payroll updates, information about the VIZZN app, well- deserved shoutouts to team members who continue to go above and beyond and more.
The newsletter is a great way to stay connected with what’s happening across our projects and recognize the hard work that keeps everything moving forward. We appreciate the dedication, teamwork and commitment to safety that our crews bring every day.
Take a moment to check it out and celebrate the progress we’re making together this season!

❄️First snow day in Washington! Our main office woke up to a winter wonderland today. While the snow can be beautiful, i...
03/13/2026

❄️First snow day in Washington! Our main office woke up to a winter wonderland today. While the snow can be beautiful, it also brings new safety risks- especially on job sites and roadways.

Remember to stay alert and prioritize safety.

Snow Safety Tips:
- Drive slowly and allow extra stopping distance
- Watch for icy surfaces and black ice
- Wear proper winter gear and slip-resistant boots
- Clear snow from walkways, equipment and vehicles
- Stay visible with high-visibility gear in low visibility conditions

Stay safe out there and enjoy the snow responsibility 🚧

Safety on the jobsite starts with awareness. 🚧Working around heavy equipment like bulldozers, excavators, cranes, and tr...
03/12/2026

Safety on the jobsite starts with awareness. 🚧
Working around heavy equipment like bulldozers, excavators, cranes, and trucks can present serious hazards if workers are not alert and following proper safety procedures. Staying aware of your surroundings, making sure operators can see you, and keeping a safe distance from moving equipment are critical steps in preventing accidents.

If you’re unsure about the hazards of a specific piece of equipment, take the time to ask questions and learn before stepping into the work area.
At the end of the day, safety isn’t just a rule — it’s a responsibility we all share on the jobsite.

👷‍♂️

03/10/2026

We’re a subcontractor on this 6.18-acre project building 6 new facilities with major site improvements like paving, drainage, landscaping, and irrigation. Our crew has completed most underground work and road base prep using heavy equipment and GPS technology. Next up: prepping 3 roads for concrete. Project runs from Dec 2024 to May 2026.

Job Update: 2412 Sumner Operations FacilityWe are proud to be serving as a subcontractor on the 2412 Sumner Operations F...
03/10/2026

Job Update: 2412 Sumner Operations Facility
We are proud to be serving as a subcontractor on the 2412 Sumner Operations Facility project, a development taking place on approximately 6.18 acres in Sumner, WA. This project includes the construction of six new buildings along with additional site work such as paving, landscaping, irrigation, perimeter fencing, EV infrastructure & chargers, stormwater improvements, and full street frontage improvements along 29th Street E. A strong team is key to keeping everything running smoothly, and we rely on Jason C, Jon D (Foreman), Pat L (Project Manager), Zac G (Superintendent), and Brooklyn C (Project Engineer) for their leadership and coordination. Currently, the crew consists of two laborers and two operators utilizing equipment including a loader, CAT 320 excavator, dozer, and mini excavator, while also implementing GPS technology to improve accuracy and efficiency on site. The team has completed most of the underground scope of work, including installing underground piping, building footing drains for seven structures to help keep water clean, placing bio-retention filters to separate oils and debris from stormwater, and installing and leveling the base rock layer for the roadways. The next phase will involve preparing space to construct three roads before another contractor places the concrete surface. This project will also positively impact the Sumner community through street improvements, better stormwater management to reduce flooding, new roadway lighting, and additional landscaping and plant installations. Construction began in December 2024 and is expected to be completed around May 2026.

Congratulations to our crew members who captured the most VIZZN photos this past month! Shoutout to Ryan K Sumner Operat...
03/04/2026

Congratulations to our crew members who captured the most VIZZN photos this past month! Shoutout to Ryan K Sumner Operations, Brandon F, Matthew M (Foreman) from Bonney Lake Project, along with Eric H, foreman on the Bainbridge job, for doing an outstanding job documenting their work and leading by example. Each winner received a $50 Outback Steakhouse gift card — well deserved! Keep up the great work, and remember, if you want a chance to win in our next gift card giveaway, keep posting your VIZZN photos — you could be our next winner! 🎉

Important Update – Job 2507: Des Moines Creek WestThe Des Moines Creek West project consists of constructing a new wareh...
02/24/2026

Important Update – Job 2507: Des Moines Creek West
The Des Moines Creek West project consists of constructing a new warehouse facility along with associated site improvements. The scope of work includes site preparation and clearing, earthwork and grading, building construction, stormwater infrastructure installation, modular wetland system construction, and sanitary sewer installation.
Our company is serving as a subcontractor on this project. Work commenced on July 7, 2025, and is scheduled for completion on September 11, 2026. At approximately 41 acres, this is currently the largest project our company is undertaking. The project maintains a workforce of approximately 13–31 dedicated personnel, including 10 operators, 3 laborers, 3–5 apprentices, and 19 carpenters (Main Contractor).
Project operations are overseen by Jeff M (Foreman), Brooklyn C (Project Engineer), Zac G (Superintendent), and Pat L (Project Manager), who ensure work progresses efficiently and safely. Major equipment on site includes 3 dozers, 5 excavators, and 2 off-road trucks. The team is also utilizing advanced Topcon GPS technology to enhance accuracy and productivity.
To date, several key milestones have been achieved, including large-scale tree removal and site clearing, completion of major grading operations, and full sanitary sewer installation. Approximately 3,000 feet of storm system has been completed, along with 4,000 feet of water line installation. Water mains have not yet been connected due to weather conditions. Concrete slab work is currently 83% complete.
The next major milestone will be completion of the underground storm system and water main installation, pending final pad preparation and wall construction.

At SCI Infrastructure, our work goes far beyond the job site. We’re proud to highlight the people, projects, and progres...
02/20/2026

At SCI Infrastructure, our work goes far beyond the job site. We’re proud to highlight the people, projects, and progress that drive our success — and we’re sharing more of that story across our social media platforms.

From crew member spotlights to project highlights and company updates, our pages give you a behind-the-scenes look at the dedication and teamwork that power SCI Infrastructure every day.

We invite you to follow along and stay connected for:

✔️ Project milestones and field updates
✔️ Crew member features and team recognition
✔️ Company news and growth
✔️ Industry insights and community involvement

Connect with us here:

🔹 LinkedIn: https://www.linkedin.com/company/sci-infrastructure

🔹 Instagram: https://www.instagram.com/sci.infrastructure.llc/

🔹 Facebook: https://www.facebook.com/profile.php?id=61588638353503

Follow us to see the work, meet the team, and stay up to date with everything happening at SCI Infrastructure.

About SCI Infrastructure, LLCFounded in 1951, SCI Infrastructure, LLC is a trusted leader in complex piping systems, und...
02/20/2026

About SCI Infrastructure, LLC
Founded in 1951, SCI Infrastructure, LLC is a trusted leader in complex piping systems, underground development, waterline improvements, and heavy civil construction services. With decades of industry experience, we deliver reliable, high-quality infrastructure solutions that support growing communities and evolving public needs.
Our expertise spans large-scale municipal and transportation projects, including Silverdale Transit Center, 24th Avenue South, Juanita Drive, Multimodal improvements, and the Hurstwood Underground Vault, among many others. We continue to expand our portfolio with new and upcoming projects that strengthen regional infrastructure.
SCI Infrastructure is also proud to support our community through sponsorship of the Annual Dozer Day event at the Western Washington Fairgrounds, helping inspire future generations in the construction industry.
Our Mission
To provide exceptional workmanship while building the critical infrastructure that enhances and supports the communities we serve.

Address

Sumner, WA
98352, 98390

Opening Hours

Monday 8am - 4pm
Tuesday 8am - 4pm
Wednesday 8am - 4pm
Thursday 8am - 4pm
Friday 8am - 4pm

Website

https://www.instagram.com/sci.infrastructure.llc/, https://www.linkedin.com/co

Alerts

Be the first to know and let us send you an email when SCI Infrastructure, LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share