10/14/2026
The build itself is the short part. Most of the calendar between signing and sitting in the shade is engineering, approvals, and material lead time — and the approval stage is where projects with other contractors tend to stall for weeks. This video walks the whole sequence in order: contract and design finalization, engineering and drawings, HOA architectural submittal, city permit review, material lead time, then the actual install. WHAT WE COVER: • Every stage from signing to completion, in order • Which stages you wait on and which we drive • Where most delays actually come from • What we handle so you don't have to chase it