ECM Contractors, Inc.

Call Directions Website

ECM Contractors, Inc. Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from ECM Contractors, Inc., Taunton, MA.

Customer focused professional painting company, specializing in delivering high standard commercial and industrial projects to our clients, in a timely and cost effective manner. General painting interior/exterior
Wallcovering Removal/Hanging
Spaciality Coating, Primers, Top Coats, Commercial, Industrial
Floor Coating, Hardwood/Laminate floor Installation
High Pressure Power Washing, Prep, Cleaning, Preserve
Exterior/Interior wood staining

NO. 05 — If water beads on the deck, it isn’t ready for stain.Five second test before you buy a single gallon.Splash som...
10/09/2026

NO. 05 — If water beads on the deck, it isn’t ready for stain.

Five second test before you buy a single gallon.
Splash some water on the boards. If it soaks in within a minute, the wood is open and ready. If it sits there in beads, the old finish is still sealing the surface — and new stain has nowhere to go.
Strip it properly, or leave it and come back next season. Staining over a sealed deck just makes a sticky film that peels by spring.
New advice every Friday.
ecmcontractors.com

That’s not the colour going. — Vinyl holds its colour a long time. What you’re looking at is sitting on top of it.It’s a...
10/06/2026

That’s not the colour going. — Vinyl holds its colour a long time. What you’re looking at is sitting on top of it.
It’s algae. — Shaded, damp, north-facing. It feeds on the surface film and works its way down.
It follows the water. — Heaviest under the gutter line and straight down the run of the downspout.
Same siding. Washed. — Low pressure, no paint, nothing replaced.
One day, not a re-side. — Back to the colour it was.

Open plenum sprayed black — deck, joists, conduit, hangers. With no ceiling grid to drop over it, everything overhead is...
10/05/2026

Open plenum sprayed black — deck, joists, conduit, hangers. With no ceiling grid to drop over it, everything overhead is finish work, and it goes on before a single wall gets rolled.

Every structural column in a live food distribution warehouse, coated safety yellow. Racking full, aisles running, produ...
10/03/2026

Every structural column in a live food distribution warehouse, coated safety yellow. Racking full, aisles running, product on the floor the whole time. Nobody shuts a distribution centre so a painter can work — so it went up around the operation, bay by bay, with the bottom four feet built heavier because that’s where the forklifts find them.

NO. 04 — A wet edge is the difference between smooth and streaky.Ever finished a wall, stood back, and seen faint stripe...
10/02/2026

NO. 04 — A wet edge is the difference between smooth and streaky.

Ever finished a wall, stood back, and seen faint stripes where you can tell exactly where you stopped?
That’s a lost wet edge. Roll about three feet at a time and lap each new section into the previous one while it’s still wet. The two blend and disappear.
Let a section dry before you come back to it and that line is there for the life of the paint.
New advice every Friday.
ecmcontractors.com

Off the hinges, laid flat on sawhorses, two thin coats instead of one thick one. Flat means no runs and you actually rea...
10/01/2026

Off the hinges, laid flat on sawhorses, two thin coats instead of one thick one. Flat means no runs and you actually reach the edges. If you pick up a brush once this year, make it the front door.

There’s no trim where the drywall meets the exposed timber. That line is cut by hand, every beam, every plate, the full ...
09/30/2026

There’s no trim where the drywall meets the exposed timber. That line is cut by hand, every beam, every plate, the full length of the room. Ceilings and gable ends first, staging moved down as we go.

Walls get ignored. Floors don’t.Everyone in a warehouse watches where they walk, because that’s where the forklifts are....
09/29/2026

Walls get ignored. Floors don’t.
Everyone in a warehouse watches where they walk, because that’s where the forklifts are. That’s why clearance zones, aisle lines, walkways and caution stencils go on the floor — and why they need to still be there next year.
We paint them. Tape looks fine for a month, then peels and smears under forklift tires. Painted markings wear back slowly and stay readable.
Electrical clearance zones, aisles and walkways, stencils, curbs and wheel stops. Warehouses, plants and storage facilities across all six New England states.
ecmcontractors.com

Four aboveground fuel tanks, delivered green.They had to be white. Nobody was moving fuel into them until they were.So w...
09/28/2026

Four aboveground fuel tanks, delivered green.
They had to be white. Nobody was moving fuel into them until they were.
So we sprayed them out on site — four tanks, shells, heads and saddles — and the job stayed on schedule instead of waiting weeks for replacements from the manufacturer.
Tanks, structural steel, catwalks and bollards. All six New England states.
ecmcontractors.com

09/26/2026

Address

Taunton, MA
02780

Opening Hours

Monday 6am - 5pm
Tuesday 6am - 5pm
Wednesday 6am - 5pm
Thursday 6am - 5pm
Friday 6am - 5pm
Saturday 6am - 5pm

Telephone

+16173087998

Alerts

Be the first to know and let us send you an email when ECM Contractors, Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share