10/14/2026
A major aerospace fastener manufacturer turned to GWS to improve a high-volume titanium process. The GWS solution increased throughput 43%, cut setup time 20%, reduced tooling and labor cost per part 28%, and delivered more than $1 million in annual savings. Learn more: